Business

T’ganu’s biogas plants fully operational, linked to grid: TDM

Both facilities began operating in March, June last year, says chairman

Updated 3 years ago · Published on

T’ganu’s biogas plants fully operational, linked to grid: TDM
Datuk Tengku Farok Hussin Tengku Abdul Jalil (right) says that the plants have the potential to generate 29.78 million kilowatt hours of renewable energy per annum using the covered lagoon system at Kemaman and Sg Tong. – TDM Berhad Facebook pic, May 28, 2023

KUALA TERENGGANU – Terengganu’s first two biogas power plants, built through a joint venture between state subsidiaries TDM Bhd (TDM) and Concord Group, have been fully operational and are successfully supplying two megawatts of power directly to Tenaga Nasional Bhd’s (TNB) grid.

Built at the cost of RM50 million, the two plants began operating in March and June last year, said TDM chairman Datuk Tengku Farok Hussin Tengku Abdul Jalil.

He added that the plants have the potential to generate 29.78 million kilowatt hours of renewable energy per annum using the covered lagoon system at Kemaman and Sg Tong. 

“Under the build, operate, own, transfer agreement signed in 2019, TDM and Concord have jointly developed, operated and maintained renewable energy-based power generation.

“We (TDM) are always looking for room to improve the quality of business without neglecting environmental sustainability,” he said after inauguration of TDM’s biogas power plant in Padang Kubu, Kemaman by Sultan of Terengganu Sultan Mizan Zainal Abidin today.

The event was also attended by Terengganu Menteri Besar Datuk Seri Ahmad Samsuri Mokhtar and Concord Group executive chairman Tan Sri Mohd Hussin Abd Hamid.

According to Tengku Farok Hussin, the project is also part of TDM’s strategies to optimise the treatment of palm oil mill effluent and reduce greenhouse gas emissions.

Additionally, the implementation of green technology initiatives also helps to strengthen the existing factory treatment system so that it does not affect the environment.

“Biogas plants will boost the generation of renewable energy and guarantee the country’s energy supply in the future,” he added. – Bernama, May 28, 2023

Related News

Business / 4y

TDM to focus on M’sian ops after stake sale of Indonesian firms

Spotlight

Malaysia

Anwar receives special recognition as 10,000 Muslims gather in Putrajaya

Malaysia

Video of elderly man being assaulted goes viral on social media

Malaysia

The wide reach of corruption and organised crime in the country

Malaysia

Malaysia pushes to give smaller economies stronger voice in Asia-Pacific trade – Anwar

Malaysia

No tsunami threat to Malaysia after 5.4-magnitude earthquake hits Banda Sea

Malaysia

Who is calling the shots in Negeri Sembilan as Ismail’s position comes under scrutiny?

Opinion

Ayob Khan: When the uniform comes off, the principles remain

Malaysia

MySiren to send emergency alerts to compatible phones nationwide from Nov 29 test

You may be interested

Business

Pengerang needs to create wider economic value, not just store more oil, says expert

Business

Three Malaysian firms placed on US trade blacklist over advanced technology diversion fears

Business

Oil retreat offers limited relief as ringgit weakens against firmer US dollar

Business

Oil origin claims need official documents, not trader papers, says expert

Business

Govt moves to block seven US-blacklisted entities from accessing local data centres

Business

Matrix Concepts ranked among top ten developers at TDPA 2026

Business

Oil extends losing streak for fourth week as supply glut outweighs Middle East tensions

Business

NexG share surge puts spotlight on RM7.5b takeover proposal as SC examines trading