Science

After failed tests, Nasa's Moon rocket heads back to workshop

The eventual Artemis-3 flight will see the first woman and first person of color touch down on the Moon's south pole

Updated 4 years ago · Published on

After failed tests, Nasa's Moon rocket heads back to workshop
Nasa’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen at sunrise atop a mobile launcher at Launch Complex 39B, as the Artemis I launch team conducts the wet dress rehearsal test on April 3, at Nasa’s Kennedy Space Center in Florida. – AFP, April 19, 2022

NASA'S Space Launch System rocket is heading back to its assembly building for repairs next week, pushing the earliest possible launch date for its uncrewed test flight to the Moon to later this summer, officials said Monday.

Since April 1 the space agency has been unsuccessfully attempting a key 'wet dress rehearsal' test, so dubbed because it involves loading liquid propellant.

The procedure is meant as a run-through of launch operations, including a final countdown to within ten seconds before blast off, but without actually firing the engines.

But Nasa teams have encountered several technical hitches.

These included a leak involving flammable liquid hydrogen, a faulty valve that prevented fueling of the upper stage and running low on supply of nitrogen that is used to purge oxygen from the rocket prior to tanking operations, for safety reasons.

The rocket, which is 98m tall with the Orion crew capsule fixed on top, will begin its slow journey back from Kennedy Space Center's Launch Complex 39B to the vehicle assembly building on April 26, where it will be repaired.

Asked what this might mean for the earliest opportunity to launch the Artemis-1 test flight to the Moon and back, senior official Tom Whitmeyer said: "I think the early June window would be challenging."

Nasa had previously envisaged a test flight as early as May.

There are subsequent launch windows in July and in August. These depend on factors like the relative positions of the Earth and Moon, as well as how long the rocket will have to fly in an eclipse, since it requires the Sun to keep it powered and thermally regulated.

A delay in Artemis-1 will have a cascading effect on subsequent missions – Artemis-2, the first uncrewed test flight around the Moon, and Artemis-3, which will see the first woman and first person of color touch down on the lunar south pole.

Nasa wants to build a permanent presence on the Moon and use it as a proving ground for technologies necessary for a Mars mission envisioned for sometime in the 2030s. – AFP, April 19, 2022

Related News

Malaysia / 3mth

Use of Jalur Gemilang without crescent moon, stars was unintentional - MB

World / 6mth

SpaceX launches its biggest, most beefed-up Starship on test flight (video)

Malaysia / 8mth

Nation holds its breath as ‘Shock Raya’ fears resurface

Malaysia / 10mth

Part of object suspected to be from space found on Pekan beach

Wellness / 10mth

Penang to ensure room for exercise and social development activities, says CM

Malaysia / 1y

Supermoon and Taurid meteor shower expected tonight

Spotlight

Malaysia

Anwar receives special recognition as 10,000 Muslims gather in Putrajaya

Malaysia

Video of elderly man being assaulted goes viral on social media

Malaysia

The wide reach of corruption and organised crime in the country

Malaysia

Malaysia pushes to give smaller economies stronger voice in Asia-Pacific trade – Anwar

Malaysia

No tsunami threat to Malaysia after 5.4-magnitude earthquake hits Banda Sea

Malaysia

Who is calling the shots in Negeri Sembilan as Ismail’s position comes under scrutiny?

Opinion

Ayob Khan: When the uniform comes off, the principles remain

Malaysia

MySiren to send emergency alerts to compatible phones nationwide from Nov 29 test

You may be interested

Health

Selangor records 18,451 haze-related illnesses, with Petaling clinics hardest hit

Community

BOH contributes RM50,000 to Malaysia’s homegrown cancer vaccine research

Events

Seven companies selected for RM15m corporate innovation programme

By Alfian Z.M. Tahir

Our Planet

Beaver Supermoon lights up November skies, begins four-month celestial spectacle