Malaysia

Where are the billions? RCI sought on delayed Pan Borneo Highway in Sabah

Warisan president bemoans problems on basic issues dogging Sabah despite allocations

Updated 2 years ago · Published on

Where are the billions? RCI sought on delayed Pan Borneo Highway in Sabah
Construction of a Pan Borneo Highway section at Membakut in Sabah. The highway is planned to span about 700km in Sabah and some 1,100 km in the Sarawak section. Bernama file pic.

by Jason Santos

WARISAN has called for the establishment of a royal inquiry into the billions of ringgit allocated for the Sabah portion of the Pan Borneo Highway, which has remained incomplete since 2016.

Its president Datuk Seri Shafie Apdal said there should be no reason not to initiate a probe on this matter as a similar proposal has been made to investigate alleged loss of funds in the case of the littoral combat ships (LCS).

“There must be a royal commission of inquiry (RCI) on the Pan Borneo Highway. Where has the money gone since it was announced in 2016?” he said.

He said this in responding to Sabah Chief Minister Datuk Seri Hajiji Noor who had earlier accused the previous Warisan-led Sabah state government helmed by Shafie of failure.

Shafie, who is the Senallang state assemblyman and Semporna MP, shot back, accusing Hajiji’s own administration of failing to deal with the problem of amenities and road conditions In Sabah.

“If cars can talk, they will complain that their feet are in pain, their tyres are punctured, their waists hurt, absorbers damaged.

“They will say there are a lot of holes on the road that needed patching up. These are the problems I can see. Don’t blame us.

“You have governed for three years, while ours just over two years,” Shafie said.

The Pan Borneo Highway is planned to span about 700km in Sabah and some 1,100 km in the Sarawak section.

The Malaysian government has approved a link road that will connect Sarawak to Sabah, bypassing Brunei.

Last Monday, federal Deputy Public Works Minister Datuk Seri Ahmad Maslan had said in Parliament that the progress of work for Package 1A of the Pan Borneo Highway is 88 per cent. He said that all the contractors for this package are from Sabah.

Meanwhile the tender process for the first phase of Package 1B is underway. A total of 300 companies have applied for tenders related to this phase which involves 15 work packages, he said.

“The tender for 15 Phase 1B packages is not only for Sabah contractors but for all Malaysians and will not be open to foreign contractors,” he said.

Ahmad was responding to a supplementary question from Shafie regarding the government's action against companies that failed to complete the Pan Borneo Highway project within the stipulated time.

Meanwhile, Shafie stressed to reporters later that billions of ringgit allocated by the federal government annually to Sabah for development projects have had to be returned to Putrajaya’s coffers as most were unused due to red tape that hampered the projects from being started.

On another note, Shafie said that Warisan is still engaged in talks with Umno on a possible electoral cooperation.

He insisted however that the party is open to cooperate with others in the upcoming Sabah election due by 2025.

He said such cooperation must hold Sabah affairs as the top priority. Warisan can work with a peninsula-based party as long as it shares this same goal.

Shafie also noted that Sabah does not have the numbers at the federal level as there are only 25 parliamentary constituencies in the state. This is not enough to potently raise issues surrounding Sabah in the Dewan Rakyat.

He lamented that Sabah and Sarawak have endured extensive periods of inadequate and substandard facilities as Malaysia marks the 61st year of its formation in 1963.

He attributed this to imbalanced distribution of funds, with primary focus placed on the peninsula.

Shafie also noted that there are still many terms stipulated in the Malaysia Agreement 1963 that have not been resolved, particularly on the finances which Sabah needs badly to resolve its pressing issues. – The Vibes, March 13, 2024

Related News

Malaysia / 1d

Sarawak PRN: DAP announces 9 candidates, including an MP and former senior cop

Malaysia / 3d

Pursue Sarawak’s rights, but do not compromise Federal interests - Fadillah

Opinion / 3d

When those entrusted to defend the country are accused of drug smuggling

Malaysia / 2w

Abang Johari hints four incumbents will be retained for Sarawak polls

Malaysia / 3w

Sarawak’s snap polls: A clean sweep for Abang Jo’s GPS?

Education / 3w

Schools to get extra holidays for Deepavali

Spotlight

Malaysia

Anwar receives special recognition as 10,000 Muslims gather in Putrajaya

Malaysia

Video of elderly man being assaulted goes viral on social media

Malaysia

The wide reach of corruption and organised crime in the country

Malaysia

Malaysia pushes to give smaller economies stronger voice in Asia-Pacific trade – Anwar

Malaysia

No tsunami threat to Malaysia after 5.4-magnitude earthquake hits Banda Sea

Malaysia

Who is calling the shots in Negeri Sembilan as Ismail’s position comes under scrutiny?

Opinion

Ayob Khan: When the uniform comes off, the principles remain

Malaysia

MySiren to send emergency alerts to compatible phones nationwide from Nov 29 test

You may be interested

Malaysia

Negeri MB unwell, being treated in hospital

Malaysia

61 per cent of Malaysians have no emergency savings of RM1,000

Malaysia

US should exempt Malaysia from new ruling on export of advance chips - LGE

Malaysia

Hannah: KLSCAH land premium row would not arise if minister was not from DAP

Malaysia

Hajiji: GRS has not decided on political cooperation for GE16

Malaysia

Myanmar junta invitation faces Dewan Rakyat scrutiny as MPs raise 3R, AI concerns

Malaysia

RAHMAH sales programme not long-term solution to cost-of-living pressures - Minister

Malaysia

Almost half of Malaysians see law enforcement as highly corrupt