Malaysia

KL Tower in poor condition, requires maintenance, repair before it is reopened to the public, says Fahmi

The communications minister said a team from his ministry and the public recently visited KL Tower and found that the building is in a bad state.

Updated 1 year ago · Published on

KL Tower in poor condition, requires maintenance, repair before it is reopened to the public, says Fahmi
He pointed out that there were some railings at the upper decks that were lowered and this was worrying. - April 17, 2025

KL Tower is in poor condition and requires maintenance and repairs before it is reopened to the public, said Datuk Fahmi Fadzil.

Fahmi said the new date for KL Tower’s reopening will be announced soon after the repairs and maintenance works are carried out.

The communications minister said a team from his ministry and the public recently visited KL Tower and found that the building is in a bad state.

"Certain repairs must be carried out before the iconic skyscraper can be reopened to the public.

“Based on videos and pictures, a lot of equipment, the kitchen, and also the revolving restaurant are not in a good or comfortable condition for visitors," he said.

He pointed out that there were some railings at the upper decks that were lowered and this was worrying.

“For the safety of visitors, we are asking the new company (operating the tower) to carry out immediate maintenance and repairs,” he told a press conference.

Fahmi also defended the federal lands commissioner’s move to enforce an eviction on KL Tower’s former operator, Menara Kuala Lumpur Sdn Bhd (MKLSB).

"KL Tower is fully owned by the government, and the new concession management has taken over since April 1.

“The Federal Land Commissioner looked into this issue and based on Section 425 of the National Land Code, there is a basis and we have gone through the process to allow the federal land commissioner to enter the premises to allow the new company to operate there,” he said.

“Based on various reasons, some reported by the media and others unreported, there are grounds for the land commissioner to enforce the takeover

“We have gone through the process to facilitate the entry of the new concession,” added Fahmi.

He also reiterated that 193 out of 205 staff members of the former concessionaire has accepted an offer by the new concessionaire - LSH Service Masters Sdn Bhd (LSHMSM). - April 17, 2025

Related News

Malaysia / 1w

Scams: Fahmi wants WhatsApp to strengthen phone number verification

Malaysia / 3w

13,045 prohibited contents detected on e-commerce platforms, says Fahmi

Malaysia / 3w

Fahmi urges media companies to seek help before resorting to layoffs

Malaysia / 3w

CSA remains open to opposition MPs – Fahmi

Malaysia / 1mth

Fahmi condemns threats against UM student over corruption remarks

Malaysia / 1mth

Budget 2027: Fahmi advises against being misled by false information

Spotlight

Malaysia

Anwar receives special recognition as 10,000 Muslims gather in Putrajaya

Malaysia

Video of elderly man being assaulted goes viral on social media

Malaysia

The wide reach of corruption and organised crime in the country

Malaysia

Malaysia pushes to give smaller economies stronger voice in Asia-Pacific trade – Anwar

Malaysia

No tsunami threat to Malaysia after 5.4-magnitude earthquake hits Banda Sea

Malaysia

Who is calling the shots in Negeri Sembilan as Ismail’s position comes under scrutiny?

Opinion

Ayob Khan: When the uniform comes off, the principles remain

Malaysia

MySiren to send emergency alerts to compatible phones nationwide from Nov 29 test

You may be interested

Malaysia

US should exempt Malaysia from new ruling on export of advance chips - LGE

Malaysia

Former Najib aide, businessman ordered to pay preacher RM433,000 over RM400,000 conspiracy

Malaysia

AKPS vows to help police uncover wider migrant-smuggling network after officer's arrest

Malaysia

Anwar receives special recognition as 10,000 Muslims gather in Putrajaya

Malaysia

Two children killed, woman critically injured as lorry crashes into motorcycle in Sarawak

Malaysia

PAC flags eight-month delay in UKM conflict-of-interest probe

Malaysia

Asyraf Wajdi furious after MRSM students served ‘raw’ soy-sauce chicken

Malaysia

Hannah: KLSCAH land premium row would not arise if minister was not from DAP