Malaysia

KLIA2 power outage report expected within a month, says Fahmi (Updated)

An official investigation report into the 28-minute power disruption at KLIA2 is expected to be completed within two to four weeks, says Communications Minister

Updated 1 year ago · Published on

KLIA2 power outage report expected within a month, says Fahmi (Updated)
The incident, attributed to a lightning strike, has been deemed 'unacceptable' by the Transport Minister (Photo from Bernama) - August 29, 2025

THE government expects a full investigation report on the recent power outage at Kuala Lumpur International Airport Terminal 2 (KLIA2) to be completed within two to four weeks, Communications Minister Datuk Fahmi Fadzil announced today.

Speaking at a post-Cabinet media briefing, Fahmi said, “Transport Minister Anthony Loke Siew Fook informed Cabinet that a detailed report is being prepared to clarify what exactly happened and what actions Malaysia Airports Holdings Bhd (MAHB) will take to prevent such incidents in future.”

“The Minister also stated that existing backup systems ensured that critical airport functions remained operational during the outage,” he added.

The power disruption occurred at approximately 2.15pm on Wednesday and lasted for 28 minutes. According to MAHB, the incident was caused by a lightning strike that affected cable connections at the terminal.

While vital systems continued to operate, the terminal experienced temporary darkness and some escalators ceased functioning. MAHB said emergency generators were activated immediately to maintain key services.

Transport Minister Anthony Loke, who was at KLIA2 then for the launch of the “Tap, Travel and Discover” campaign, criticised the incident in strong terms, describing it as “completely unacceptable”.

“Things like these give a very bad image to our country,” Loke said during the event. “In public transport, any technical disruption beyond 15 minutes is considered major—especially at the nation’s primary gateway.”

Loke noted that upon his arrival at 2.10pm, the event had to be delayed until 2.35pm due to the outage. “Many systems were not functioning. The terminal was dark, escalators stalled, although the information boards were still working.”

He questioned why the backup systems had not engaged as expected, demanding accountability.

“I have instructed MAHB and gateway\@klia2 to prepare a full report within 24 hours explaining the cause. I don’t want excuses—I want a solution and assurance that this will not happen again,” he said.

The outage also caused congestion in certain areas of the terminal and disrupted business operations within retail outlets.

On a separate matter, Fahmi said Prime Minister Datuk Seri Anwar Ibrahim has expressed satisfaction with the preparations and full-dress rehearsal for the National Day 2025 celebration, held earlier today at Dataran Putrajaya.

“The Prime Minister conveyed his approval during the weekly Cabinet meeting. He felt the preparations were well-coordinated. What excited him most was the energy and spirit shown by the young people involved in the ‘Human Graphic’ performance,” Fahmi said during a post-Cabinet press conference.

Fahmi added that Anwar had urged all ministers to make time to attend the national event, describing it as a significant occasion for the country.

“He seemed very satisfied with the overall readiness,” he said.

As Communications Minister, Fahmi also shared that the celebration is expected to draw a crowd of around 100,000 visitors.

In addition to the main event, the public can look forward to a wide range of supporting programmes, including Riuh Merdeka, free film screenings, a concert, and a fireworks display.

This year’s National Day celebration will feature more than 14,000 participants, 78 government and military vehicles, seven decorated floats, cultural performances, and an aerial display.  - August 29, 2025

Spotlight

Malaysia

Father and son escape death as 4WD swept 500m downstream after plunging into river

Malaysia

Shuhaily transferred from AKPS to IGP’s office

Malaysia

Anwar raises alarm over alleged Mossad expansion in southern Thailand

Malaysia

Woman loses RM208,700 after 15 transfers in fake job scam

Malaysia

Hannah: MACC has all details on Chinese Assembly Hall land lease

Malaysia

Penang DAP backs simultaneous state, general elections amid possibility of GE16 next August

By Ian McIntyre

Malaysia

Fadillah sees GE16 next year, urges Sarawak voters to give GPS stronger mandate

Malaysia

No missing RM225m research funds, says Higher Education Ministry

World

Netanyahu offers to step aside in proposed unity government led by rival Eisenkot

You may be interested

Malaysia

MySiren aims to close critical gap in emergency warnings

Malaysia

RXZ rider killed after motorcycle skids, catches fire on North-South Expressway

Malaysia

Air Kelantan threatens SLAPP suit over complaints about water quality

Malaysia

In-person BAP collection is to get parents involved in children's education - Anwar

Malaysia

Father and son escape death as 4WD swept 500m downstream after plunging into river

Malaysia

Hannah: MACC has all details on Chinese Assembly Hall land lease

Malaysia

Sarawak PRN: GPS wins 29 seats unopposed, just 13 short of simple majority

Malaysia

Sarawak PRN: Abdul Karim, Fazzrudin from GPS win unopposed