Malaysia

PETRA expands MADANI village programme with solar-powered Orang Asli community project

A RM2.5 million pilot initiative in Kampung Orang Asli Berasau delivers off-grid solar electricity and a new community hall, marking a first-of-its-kind rural energy transition under the MADANI framework

Updated 7 months ago · Published on

PETRA expands MADANI village programme with solar-powered Orang Asli community project
Authorities say the project is designed not as a one-off aid scheme but as a long-term development intervention aimed at ensuring no community is left behind - April 18, 2026

THE government has intensified its rural development agenda under the MADANI framework with the launch of a solar-powered infrastructure project in Kampung Orang Asli Berasau, Kluang, Johor, aimed at improving essential services and narrowing the urban–rural divide.

The initiative, part of the Kampung Angkat MADANI programme, is led by the Ministry of Energy Transition and Water Transformation (PETRA), and represents one of the government’s flagship efforts to upgrade basic infrastructure in rural communities.

The project was inaugurated by Deputy Prime Minister II Datuk Seri Fadillah Yusof today, alongside Johor Menteri Besar Datuk Onn Hafiz Ghazi.

The project was officially launched at Kampung Orang Asli Berasau, where authorities highlighted that it is designed not as a one-off aid scheme but as a long-term development intervention aimed at ensuring no community is left behind.

Fadillah, in his speech, said the initiative was first introduced in the 2024 Budget as a benchmark approach to improving rural access to electricity, clean water, roads and digital connectivity through a “whole of government” strategy.

Under the programme, 43 villages benefited in 2024, rising sharply to 219 villages in 2025, with the government targeting up to 500 villages by 2026 following positive impact assessments.

“At Kampung Orang Asli Berasau, PETRA has implemented a RM2.5 million infrastructure package following consultations with residents and local authorities.

“The key components include 24-hour reliable electricity supply and a fully covered solar-powered community hall for social, educational and official activities serving both Berasau and surrounding villages,” Fadillah added.

The hall features an integrated photovoltaic system designed to function as both a communal facility and an energy-generating structure, providing continuous electricity to the area.

The system uses an off-grid solar photovoltaic setup with a capacity exceeding 50 kilowatt peak and energy storage of 516 kilowatt hours, enabling the village to operate independently from the national electricity grid.

Fadillah, who also serves as Energy Transition and Water Transformation (PETRA) Minister said the project is the first of its kind implemented in a remote Orang Asli settlement located far from main road networks, benefiting more than 20 households alongside the community hall.

The implementation involves collaboration between PETRA, the Sustainable Energy Development Authority Malaysia, and the Public Works Department Malaysia, along with federal and Johor state agencies.

He said the initiative aligns with Malaysia’s MADANI vision, which emphasises inclusivity, sustainability and equitable access to infrastructure, particularly for rural and indigenous communities.

By introducing clean solar energy systems, the programme aims not only to improve daily living conditions but also to reduce reliance on conventional energy sources in rural areas.

The government said the project reflects its broader commitment to social equity and balanced regional development, ensuring that rural and Orang Asli communities receive infrastructure upgrades comparable to urban areas under Malaysia’s long-term development strategy. - April 18, 2026

Spotlight

Malaysia

No nation will become poor by helping the poor – Anwar

Malaysia

Negeri Sembilan PH lauds Tuanku Muhriz’s wisdom in handling political crisis

Malaysia

I am not disappointed at not being appointed Menteri Besar – Jalaluddin

Malaysia

DAP demands equal enforcement after three leaders summoned for questioning

Malaysia

Deaf man’s alleged knife attack on disable girlfriend: Court defers charge for sign language interpreter

Malaysia

Negeri Sembilan Exco to meet twice weekly to clear two-month backlog

Malaysia

‘Do not repeat past mistakes,’ Tuanku Muhriz warns new Negeri Sembilan Exco

People

Penang Exco stuck in traffic resorts to video call to greet guests at event

By Ian McIntyre

You may be interested

Malaysia

Malaysia has until 1Q2027 to fend off additional US tariffs, keep 19% ceiling

Malaysia

Anwar: 5,101 small businesses receive RM15m in federal equipment aid

Malaysia

Inspector Sheila challenges police dismissal over alleged denial of fair hearing

Malaysia

Uncertified imports sold online put consumers, local manufacturers at risk

Malaysia

AKPS enforcement seizures quadruple to RM322.7 million in 10 months

Malaysia

Sarawak PRN: 721 nomination forms sold, 40 candidates have paid deposits

Malaysia

Najib abandons bid to revive RM1.9m suit against Tommy Thomas

Malaysia

Drug syndicate moved 3 tonnes of syabu worth RM156m through RMAF bases in Sabah