Malaysia

Illegal Rohingya settlement demolished after widespread public outcry

A remote four storey flat and commercial hub illegally constructed and occupied by the Rohingya community in Hulu Langat is being dismantled by the property owner

Updated 5 months ago · Published on

Illegal Rohingya settlement demolished after widespread public outcry
The demolition was the result of intense social media scrutiny and rapid abandonment by its residents (Photo from Utusan) - June 13, 2026

A CONTROVERSIAL settlement centered around a four storey flat structure allegedly constructed illegally by the Rohingya ethnic community in Sungai Tekali near Hulu Langat is currently being demolished.

Kampung Sungai Makau village chief Karen Chong, 48, confirmed that the demolition works commenced at 11am today and are expected to take approximately two weeks to be fully completed.

She further noted that the entire cost of the demolition is being borne by the building owner, who came forward to take full responsibility after the settlement attracted widespread attention.

The enforcement action follows a recent site survey which revealed that the four storey flat, hidden in a remote pocket of Sungai Tekali, had already been hastily abandoned by its occupants.

The vast majority of the units within the dilapidated building were found padlocked, indicating that the residents fled to alternative locations shortly after videos of the unauthorised settlement went viral on social media three days ago.

Buletin TV3, reported that the initial exposure highlighted the severe structural hazards of the complex, displaying an extremely weathered four storey block featuring corridors enclosed with zinc roofing and exposed brick walls that lacked proper plastering or cement finishing.

Furthermore, the multi storey residential structure was found to be serviced by highly suspicious, tangled webs of makeshift water pipes and electrical wiring.

Beyond serving as basic accommodation, the site survey established that the compound had been developed into a self-sustaining micro economy for the local Rohingya community.

The ground floor of the main building housed a coffee processing facility, while the rear perimeter featured a mechanical workshop, a dedicated lorry parking depot, and a small eatery where cooking equipment was found abandoned in a hurry despite the main electricity supply still being active. - June 13, 2026

Spotlight

Malaysia

Durian trader in Raub loses nearly half a million in AI-based investment

Malaysia

GPS banks on fresh faces, retains Abang Johari and key incumbents for Sarawak polls

Malaysia

Anwar yet to accept Anthony Loke's resignation, says DAP chief remains on leave

Business

MAG to add 10 Boeing Dreamliners in long-term fleet expansion drive

Malaysia

Court imposes gag order in case against AKPS chief Mohd Shuhaily

Malaysia

Cyber scam losses hit estimated RM19.7b in a year

Malaysia

Govt approves RM451m for projects in 66 opposition-held constituencies

By Alfian Z.M. Tahir

You may be interested

Malaysia

PKR Sarawak opts out of state election to preserve political cooperation with GPS

Malaysia

Court imposes gag order in case against AKPS chief Mohd Shuhaily

Malaysia

Sixty-year jail term for teacher who sexually abused eight children

Malaysia

Man charged with murdering mother in Banting

Malaysia

MCMC sues Google for RM300m over alleged failure to remove defamatory YouTube content

Malaysia

TUDM pilot acted as coordinator, transporter in RM4.83m drug syndicate - police

Malaysia

Anwar yet to accept Anthony Loke's resignation, says DAP chief remains on leave

Malaysia

Trio arrested after 62-year-old man assaulted following road accident in Terengganu