Malaysia

Study on bridge design to replace undersea tunnel underway – Zairil

The study takes into account the expansion plans for the Port of Penang, as well as the need to alleviate traffic congestion in the Gurney Bay area and its surroundings.

Updated 3 weeks ago · Published on

Study on bridge design to replace undersea tunnel underway – Zairil
The North Coast Paired Road (NCPR) project involves a proposed route stretching from the Tanjung Bungah area to Teluk Bahang. - November 2, 2026

by Ian McIntyre

THE Penang State Government has approved a study on the realigned route for the Third Link, which proposes a bridge design as an alternative to the previously suggested undersea tunnel.

Zairil Khir Johari, the State Executive Councillor for Infrastructure, Transport, and Digital, stated that the study takes into account the expansion plans for the Port of Penang, as well as the need to alleviate traffic congestion in the Gurney Bay area and its surroundings.

According to him, the proposed realignment involves shifting the route further north to ensure compatibility with the port's expansion plans, while also avoiding any disruption to port operations and vessel navigation lanes.

“At present, a conceptual design study is underway. Its findings will be presented to the Penang Port Commission (PPC) for feedback and further consideration. 

“This assessment aims to ensure that any decision on the project’s implementation takes into account technical feasibility, financial implications, public mobility needs, maritime safety and navigation, as well as the long-term benefits to the state’s socioeconomic development,” he said during the Penang State Legislative Assembly sitting, today.

He stated this while responding to Teh Lai Heng (DAP – Komtar) regarding the latest status of three highway projects and one undersea tunnel under the Penang Transport Master Plan (PTMP) as of September 2026.

Zairil (DAP – Tanjung Bungah) noted that the assessment of these projects aims to ensure that implementation decisions take into account technical feasibility, financial implications, the public’s mobility needs, maritime safety and navigation, as well as long-term benefits for the state’s socio-economic development.

According to him, the four project packages are at different stages of implementation and planning, with only Package 1 currently being executed.

He explained that the North Coast Paired Road (NCPR) project involves a proposed route stretching from the Tanjung Bungah area to Teluk Bahang.

The NCPR project is part of the “three main roads and a tunnel” project awarded in 2013, which entails the construction of a 10.61-kilometre (km) highway comprising 8.41 km of land-based road and 2.2 km of coastal viaduct connecting Tanjung Bungah to Teluk Bahang.

Once completed, the travel time from Tanjung Bungah to Teluk Bahang is expected to be reduced from 30–45 minutes during peak hours to just seven minutes.

In a related development, Zairil stated that the state government is reviewing parts of the project alignment to ensure that the proposed plans account for technical feasibility, local sensitivities, population density, and the risk of soil erosion.

“In this regard, the terms of the Sub-Agreement (SA) are currently being finalised before signing.

“At the same time, the state government is also in the process of conducting an Environmental Impact Assessment (EIA) for a portion of the new alignment,” he said.

According to him, this approach is essential to ensure that the proposed development takes into account transportation needs, safety, and the interests of the residents.

Meanwhile, regarding the project connecting Bandar Baharu Air Itam to the Tun Dr Lim Chong Eu Expressway, Zairil stated that it had reached 93.19 per cent physical completion as of September 30.

He noted that the project is expected to be completed by April 2027 and will only be opened to road users once testing and commissioning have been carried out and a Road Safety Audit (RSA) has been approved.  – November 2, 2026

Related News

Stage / 1d

Dancers thrill audience with their enchanting ballet performance

Malaysia / 2d

Penang must appreciate what Anthony Loke has done - Guan Eng

Books / 3d

Book on the life and legacy of Tun Tan Cheng Lock launched

Off beat / 1w

Penang moves to strengthen position as green manufacturing hub

Events / 1w

Annie Tan looks to keep traditional Asian flavours relevant through modern dining

Community / 1w

Penang looks towards AI for greater sustainability

Spotlight

Malaysia

Anwar receives special recognition as 10,000 Muslims gather in Putrajaya

Malaysia

Video of elderly man being assaulted goes viral on social media

Malaysia

The wide reach of corruption and organised crime in the country

Malaysia

Malaysia pushes to give smaller economies stronger voice in Asia-Pacific trade – Anwar

Malaysia

No tsunami threat to Malaysia after 5.4-magnitude earthquake hits Banda Sea

Malaysia

Who is calling the shots in Negeri Sembilan as Ismail’s position comes under scrutiny?

Opinion

Ayob Khan: When the uniform comes off, the principles remain

Malaysia

MySiren to send emergency alerts to compatible phones nationwide from Nov 29 test

You may be interested

Malaysia

MPs urged to debate merits of reinstating GST as against SST, says Liew Chin Tong

Malaysia

Four 1MDB-linked paintings to be displayed publicly, free of charge

Malaysia

Mother returns to SPM examination hall after 20 years to stand alongside autistic son

Malaysia

PH still has opportunity to win over young Malay voters, says Ilham Centre

Malaysia

Malaysia's first Global Minimum Tax revenue not expected until second half of 2027

Malaysia

PAC flags eight-month delay in UKM conflict-of-interest probe

Malaysia

Sarawak PRN: DAP announces 9 candidates, including an MP and former senior cop

Malaysia

Zahid’s GST proposal revives scrutiny of PAS’ ‘haram’ ruling