Malaysia

Families affected by proposed dam will be taken care of: Bung Moktar

Only about 30 families from a single village may need to be relocated to make way for the dam, says state infrastructure minister

Updated 5 years ago · Published on

Families affected by proposed dam will be taken care of: Bung Moktar
Sabah Infrastructure Development Minister Datuk Seri Bung Moktar Radin assures that the state will look after the welfare any villagers affected by the building of a proposed dam. – Bernama pic, January 22, 2021

by Jason Santos

KOTA KINABALU – Sabah First Deputy Chief Minister Datuk Seri Bung Moktar Radin has given his assurances that the welfare of the villagers residing near a proposed dam would be looked after.

Bung Moktar, who is also the state infrastructure development minister, said the government has not decided whether to build the dam, as planned under the third phase of the Kota Kinabalu Water Supply Plan, but said the project overall will proceed.

“We will have to proceed with the project for the long term welfare of the people,” he said after raising the subject of water supply disruptions which have hit several areas on Sabah’s west coast recently.

“If there’s a need to relocate people, firstly we will meet and talk with them. If they need to be moved, then we will provide them new residences, provide electricity, water, and leverage their status from that of a village to an organised townships and even provide them lands for them to cultivate. 

“They won’t end up with nothing,” he said.

Bung Moktar said there are only around 30 families from one village that may need to be relocated.

Bung Moktar hoped the water supply problem would not be politicised, adding that 30% of Kota Kinabalu residents are facing water shortages, while nearly half of all Sabahans also do not have a reliable water supply.

The construction of the dam, at a cost of around RM3 billion, will ensure the supply of water in many parts of Sabah’s west coast for up to 100 years. 

Bung Moktar however said if the dam is built in Mandalipau, Tawau, or further downstream, which was the location earlier mooted by the then Warisan-led Sabah government, it would only last for up to 60 years. 

In contrast, if the dam is built in the Ulu Papar area (upstream) where it was initially proposed, the water supply would last for up to 85 years tops, he said. 

“But the source of river is still the same which is the Papar river,” he said.

The Sabah Water Department has already surveyed the land and it is up to the government to decide when the project would commence, he said. – The Vibes, January 22, 2021

Related News

Opinion / 3d

When those entrusted to defend the country are accused of drug smuggling

Opinion / 1mth

The Malaysia Agreement 1963: Grievances and expectations in Sabah and Sarawak

Malaysia / 1mth

Budget 2027: Sabah, Sarawak to receive RM34.9b in federal allocations next year

Events / 1mth

Sarawak and Sabah play key roles in weathering climate change

Malaysia / 1mth

Address security concerns and let concert proceed – former Sabah CM

Malaysia / 2mth

A message from our publisher and chairman

Spotlight

Malaysia

Anwar receives special recognition as 10,000 Muslims gather in Putrajaya

Malaysia

Video of elderly man being assaulted goes viral on social media

Malaysia

The wide reach of corruption and organised crime in the country

Malaysia

Malaysia pushes to give smaller economies stronger voice in Asia-Pacific trade – Anwar

Malaysia

No tsunami threat to Malaysia after 5.4-magnitude earthquake hits Banda Sea

Malaysia

Who is calling the shots in Negeri Sembilan as Ismail’s position comes under scrutiny?

Opinion

Ayob Khan: When the uniform comes off, the principles remain

Malaysia

MySiren to send emergency alerts to compatible phones nationwide from Nov 29 test

You may be interested

Malaysia

KLIA Customs intercepts methamphetamine shipments disguised as vape cartridges, Chinese tea

Malaysia

Teacher remanded 7 days over alleged sexual assault of 17-year-old student in Terengganu

Malaysia

Who is calling the shots in Negeri Sembilan as Ismail’s position comes under scrutiny?

Malaysia

Malaysia's first Global Minimum Tax revenue not expected until second half of 2027

Malaysia

The wide reach of corruption and organised crime in the country

Malaysia

Zahid’s GST proposal revives scrutiny of PAS’ ‘haram’ ruling

Malaysia

Negeri MB unwell, being treated in hospital

Malaysia

RAHMAH sales programme not long-term solution to cost-of-living pressures - Minister