Malaysia

Penang wants ‘brakes’ on rainwater run-off after fresh floods

State govt to propose city councils make system’s installation in private driveways, public walkways a must

Updated 5 years ago · Published on

Penang wants ‘brakes’ on rainwater run-off after fresh floods
Exco Phee Boon Poh says Penang will also work on enlarging Sg Jelutong. – CM’s Office pic, September 29, 2021

by Ian McIntyre

GEORGE TOWN – The Penang government will propose that its two city councils make it mandatory for private driveways and public walkways to be installed with an “interlocking brakes” system to curb rainwater run-off, to prevent flash floods.

Exco Phee Boon Poh said this is part of the state’s efforts to mitigate the effects of climate change, which has caused more severe rain that ends up damaging properties and endangering lives.

The said system acts as a shield against excess run-off from surfaces, he told The Vibes.

“The interlocking brakes can prevent tremendous water run-off on surfaces. They can then be released automatically once the earth is able to absorb the excess water.”

Through sensors, the system can also be linked to river levels, he said.

He said the concept should be made compulsory for all future development projects in Penang, as the pattern of heavy rainfall is expected to continue due to global warming.

It should be enforced especially for hillside projects and farms built on slopes, so as to guard against erosion, which triggers landslides, said Phee.

He said Penang will also work on enlarging Sg Jelutong.

His comments come after the state was again inundated with floods last night. There were also at least two minor landslides in Tg Bungah here.

Meanwhile, the Penang Water Supply Corporation (PBAPP) urged motorists to avoid the winding road on the hill where the Guillemard Reservoir in Tg Bungah is located, following a landslide in the area.

A wide section of the slope, measuring about 10m in height and 9m in width, collapsed some 50m from the entrance of the reservoir about 9.30pm yesterday, scattering debris along a section of the route.

A 1.5km section of the road was temporarily closed today for emergency clearing works by Public Works Department and PBAPP personnel. – The Vibes, September 29, 2021

Related News

Stage / 1d

Dancers thrill audience with their enchanting ballet performance

Malaysia / 2d

Penang must appreciate what Anthony Loke has done - Guan Eng

Books / 3d

Book on the life and legacy of Tun Tan Cheng Lock launched

Off beat / 1w

Penang moves to strengthen position as green manufacturing hub

Events / 1w

Annie Tan looks to keep traditional Asian flavours relevant through modern dining

Malaysia / 1w

23 million vehicles do not have flood insurance - PIAM

Spotlight

Malaysia

Anwar receives special recognition as 10,000 Muslims gather in Putrajaya

Malaysia

Video of elderly man being assaulted goes viral on social media

Malaysia

The wide reach of corruption and organised crime in the country

Malaysia

Malaysia pushes to give smaller economies stronger voice in Asia-Pacific trade – Anwar

Malaysia

No tsunami threat to Malaysia after 5.4-magnitude earthquake hits Banda Sea

Malaysia

Who is calling the shots in Negeri Sembilan as Ismail’s position comes under scrutiny?

Opinion

Ayob Khan: When the uniform comes off, the principles remain

Malaysia

MySiren to send emergency alerts to compatible phones nationwide from Nov 29 test

You may be interested

Malaysia

Speaker reprimands ministers over outstanding written answers to MPs' questions

Malaysia

Tuanku Muhriz supporters demand probe into alleged impersonation at royal event

By Alfian Z.M. Tahir

Malaysia

Woman killed as Tesla allegedly runs red light and crashes into car in Kulim

Malaysia

Zahid’s remarks on family interference come back to haunt him after daughter defends his position

Malaysia

PAC flags eight-month delay in UKM conflict-of-interest probe

Malaysia

Malaysia pushes to give smaller economies stronger voice in Asia-Pacific trade – Anwar

Malaysia

Filipino man jailed 10 years for sexually assaulting 10-year-old girl in Lahad Datu

Malaysia

Federal Government, Sabah and Sarawak continue talks on new special grant formula