Malaysia

RM330.9 million channelled for development in Sarawak under 11th Malaysia Plan

Hamzah was responding to a question from Datuk Robert Lawson Chuat (GPS-Betong)

Updated 6 years ago · Published on

RM330.9 million channelled for development in Sarawak under 11th Malaysia Plan
Deputy Minister of Agriculture and Food Industry I Datuk Seri Ahmad Hamzah said the ministry also channelled an allocation of RM6.7 million under the Economic Stimulus Package (PRE) 2020 to several implementing agencies, such as the Sarawak Irrigation and Drainage Department and all IADAs in the state. – The Vibes pic, November 12, 2020

KUALA LUMPUR – The government has channelled RM330.9 million in development allocation for Sarawak under the 11th Malaysian Plan (11MP) which ends this year.

Deputy Minister of Agriculture and Food Industry I Datuk Seri Ahmad Hamzah said the distribution of the allocation was based on the five-year Rolling Plan (RP), beginning with RP1 in 2016 to RP4 in 2020.

He said the ministry,  through the Agricultural Irrigation and Drainage Division (BPSP), had carried out several programmes for the development of agricultural infrastructure in Sarawak through the 11MP.

“Sarawak has huge potential and is able to contribute to the increase in national food production. This is significant with the establishment of four new IADAs (Integrated Agricultural Development Areas) with focus on padi, including the Batang Lupar IADA  in Sarawak.

“To ensure the direction is achieved, MAFI places high commitment and effort in the planning, building and upgrading of agricultural infrastructure facilities throughout the country, including in Sarawak," he said during the question and answer session in the Dewan Rakyat today.

He was responding to a question from Datuk Robert Lawson Chuat (GPS-Betong) on ​​the Agriculture and Food Industry Ministry’s efforts and direction in developing agriculture infrastructure and drainage programmes in Sarawak and the total allocation disbursed to the state under the 11MP.

Ahmad said the ministry also channelled an allocation of RM6.7 million under the Economic Stimulus Package (PRE) 2020 to several implementing agencies, such as the Sarawak Irrigation and Drainage Department and all IADAs in the state.

The fund was channelled to carry out maintenance work on existing agricultural infrastructure and roads in Sarawak, he added. – Bernama, November 12, 2020

Spotlight

Malaysia

Anwar receives special recognition as 10,000 Muslims gather in Putrajaya

Malaysia

Video of elderly man being assaulted goes viral on social media

Malaysia

The wide reach of corruption and organised crime in the country

Malaysia

Malaysia pushes to give smaller economies stronger voice in Asia-Pacific trade – Anwar

Malaysia

No tsunami threat to Malaysia after 5.4-magnitude earthquake hits Banda Sea

Malaysia

Who is calling the shots in Negeri Sembilan as Ismail’s position comes under scrutiny?

Opinion

Ayob Khan: When the uniform comes off, the principles remain

Malaysia

MySiren to send emergency alerts to compatible phones nationwide from Nov 29 test

You may be interested

Malaysia

Zahid’s GST proposal revives scrutiny of PAS’ ‘haram’ ruling

Malaysia

Four 1MDB-linked paintings to be displayed publicly, free of charge

Malaysia

Three arrested after police chase involving wrong-way escape on Second Link Highway

Malaysia

Federal Government, Sabah and Sarawak continue talks on new special grant formula

Malaysia

Kuantan-Gombak rail journey to be cut to 90 minutes with ECRL launch

Malaysia

Indonesia seizes RM229m in drugs from Malaysia-linked trafficking network

Malaysia

Hannah: KLSCAH land premium row would not arise if minister was not from DAP

Malaysia

Former Najib aide, businessman ordered to pay preacher RM433,000 over RM400,000 conspiracy