Malaysia

‘Why is MRT3 ridership projection lower than MRT1, MRT2?’

Projected 180,300 passengers daily drastically smaller than those of other lines, says PKR veep

Updated 4 years ago · Published on

‘Why is MRT3 ridership projection lower than MRT1, MRT2?’
While MRT3’s projected ridership in 2028 after completion is 180,300 passengers, this is expected to increase to 1.01 million passengers daily in 2060.– The Vibes file pic, August 11, 2022

KUALA LUMPUR – The Transport Ministry must explain why MRT3’s projected average daily ridership upon completion will be lower than that of the MRT1 and MRT2 lines, PKR vice-president Chang Lim Keng said.

The Tanjung Malim MP said MRT3’s projected average of 180,300 passengers daily falls short compared with the 442,000 for the MRT1 (Kajang Line), and 529,000 for the MRT2 (Putrajaya Line).

Chang noted that the MRT3 line is longer than MRT1, at 51km and 33 stations, compared with the MRT1’s 42km and 29 stations. The MRT2 line is 56km with 36 stations.

“What makes the ridership projection plummet so drastically to 180,300? MRT3 is longer than MRT1 and will pass by more stations, but its daily ridership projection is only 40% of MRT1.

“Compared with MRT2, MRT 3 is only 5km shorter and three stations fewer, but its daily ridership projection could not even attain 35% of MRT2.

“Either the minister gave a fake answer in Parliament on the MRT3 projection, or projections on MRT1 and MRT2 are vastly inaccurate. If so, the previous government was deceived into building the extravagant MRT1 and MRT2,” Chang said in a statement today.

MRT3, to cost around RM50 billion, is currently under construction.

Chang, however, said that since MRT1 launched operations in 2017, its average daily ridership had only peaked at 204,821 in 2019.

“Not only was it nowhere near its target, it was not even half of its projection of 442,000,” he said.

During the last Parliament sitting, Chang had submitted a question to the Transport Ministry on the MRT3 average daily ridership projection.

Transport Minister Datuk Seri Wee Ka Siong replied that MRT3 is scheduled to operate in two phases, in 2028 and 2030, respectively. 

While projected ridership in 2028 after completion is 180,300 passengers, this is expected to increase to 1.01 million passengers daily in 2060. – Bernama, August 11, 2022

Related News

Opinion / 1w

Melaka just highlights the continuing downward trend of PKR

Malaysia / 1mth

Hassan disappointed by ministers’ absence during Budget 2027 debate

Malaysia / 1mth

‘We have better things to do than orchestrate khalwat raids’ - Amirudin

Malaysia / 1mth

PKR leader challenges BN to state position on Eric See-To controversy

Malaysia / 1mth

Santhara back in PKR, but RM10m bond dispute remains

Malaysia / 1mth

PKR questions Lee’s attendance at party, Petaling Jaya meetings

Spotlight

Malaysia

Anwar receives special recognition as 10,000 Muslims gather in Putrajaya

Malaysia

Video of elderly man being assaulted goes viral on social media

Malaysia

The wide reach of corruption and organised crime in the country

Malaysia

Malaysia pushes to give smaller economies stronger voice in Asia-Pacific trade – Anwar

Malaysia

No tsunami threat to Malaysia after 5.4-magnitude earthquake hits Banda Sea

Malaysia

Who is calling the shots in Negeri Sembilan as Ismail’s position comes under scrutiny?

Opinion

Ayob Khan: When the uniform comes off, the principles remain

Malaysia

MySiren to send emergency alerts to compatible phones nationwide from Nov 29 test

You may be interested

Malaysia

Harith Iskander's legal representation in Rosmah defamation suit hangs in balance

Malaysia

Govt eyes up to 250,000 jobs from RM170bil carbon capture industry by 2050

Malaysia

No tsunami threat to Malaysia after 5.4-magnitude earthquake hits Banda Sea

Malaysia

Federal Government, Sabah and Sarawak continue talks on new special grant formula

Malaysia

MPs urged to debate merits of reinstating GST as against SST, says Liew Chin Tong

Malaysia

National Laureate A Samad Said dies at 91

By Alfian Z.M. Tahir

Malaysia

RAHMAH sales programme not long-term solution to cost-of-living pressures - Minister

Malaysia

PAC flags eight-month delay in UKM conflict-of-interest probe