Malaysia

Repairs on Jalan Chikus to take three months

Motorists advised to use alternative roads to Teluk Intan

Updated 5 years ago · Published on

Repairs on Jalan Chikus to take three months
Jalan Chikus experienced a cave-in last Monday due to damage from severe flooding in the area. – Twitter pic, January 6, 2021

IPOH – Repair work of Jalan Chikus in Hilir Perak that links Chikus town and Jalan Attaduri to Teluk Intan, which was damaged following a cave-in last Monday, will take three months, said Perak Infrastructure, Energy, Water and Public Transport Committee chairman Datuk Mohd Zolkafly Harun.

He said the repairs will cost RM2.2 million and during the period, motorists are advised to use alternative roads to Teluk Intan.

The alternative roads are Jalan Teluk Dalam-Teluk Gedung, Jalan Changkat Jong-Kampar, Jalan Sg Lampam-Sg Tunku, Jalan Sg Manik Labu Kubong Chenderong Balai and Jalan Attaduri,” he told a media conference today.

In another development, he said the Perak state executive council during its meeting today has decided to temporarily halt all recreational activities in the highland and interior areas for public safety following several incidence of landslides, including along the East-West Highway in Gerik today.

On the issue of the bad condition of Jalan Kg Redang Sawa in Kampar to Kg Pisang in Batu Gajah, Zolkafly said an allocation of RM80 million has been set aside for the project.

The Perak Public Works Department will call for the tender for the project next month and work on the project is expected to take 36 months, he added.

On the Jambatan Stesen Bas Tg Malim, which links Tg Malim to Hulu Bernam in Selangor, he said the bridge is safe for use. – Bernama, January 6, 2021

Related News

Malaysia / 5y

RM2.2 mil needed to fix collapsed Chikus road

Malaysia / 5y

100-km stretch of Jalan Chikus in Perak closed off

Spotlight

Malaysia

Durian trader in Raub loses nearly half a million in AI-based investment

Malaysia

GPS banks on fresh faces, retains Abang Johari and key incumbents for Sarawak polls

Malaysia

Anwar yet to accept Anthony Loke's resignation, says DAP chief remains on leave

Business

MAG to add 10 Boeing Dreamliners in long-term fleet expansion drive

Malaysia

Court imposes gag order in case against AKPS chief Mohd Shuhaily

Malaysia

Cyber scam losses hit estimated RM19.7b in a year

Malaysia

Govt approves RM451m for projects in 66 opposition-held constituencies

By Alfian Z.M. Tahir

You may be interested

Malaysia

US should exempt Malaysia from new ruling on export of advance chips - LGE

Malaysia

Türkiye's four million refugee burden behind rejection of Malaysia's Rohingya request

Malaysia

Hannah: KLSCAH land premium row would not arise if minister was not from DAP

Malaysia

Nepal cuts presumed-death declaration period for 54 missing Malaysians from 12 years to 45 days

Malaysia

Sabah O&G contracts to local firms surge nearly ninefold to RM3b

Malaysia

Bloodstains, flesh fragments lead to discovery of man's body in Nibong Tebal

Malaysia

Plugging leakages, curbing waste key to channelling savings back to Malaysians, says Saifuddin

Malaysia

Govt approves RM451m for projects in 66 opposition-held constituencies

By Alfian Z.M. Tahir